Opened.Pages

使用场景

工程的安全评估分享

Share the assessment through a controlled link, review access activity, and revoke it when the review window closes. Engineering teams can time review requests before design or implementation discussions.

用户收益

The security team can monitor delivery and close link access when the review period ends. Engineering teams can check whether technical reviewers opened the file before implementation discussions.

工作流程

  1. 准备: Share the assessment through a controlled link, review access activity, and revoke it when the review window closes. Engineering teams can time review requests before design or implementation discussions.
  2. 控制访问: Upload the PDF, create a private link, choose download access, and keep the option to revoke the link.
  3. 分享: Send the private link to the intended engineering audience.
  4. 查看送达信号: Review the open time, approximate location and network organization when available, device and browser categories, and active dwell time. An open does not establish identity, comprehension, or intent.
创建私人链接